BIDDING
OPPORTUNITIES**
For Bid Information, call (209) 468-3043
For Project Information, call (209) 468-3014
Page Last Updated
Thursday, September 04, 2008
NOTE:
The plans and specifications available on this web page are for
convenience only. In order to submit a bid, plans and specifications
must be purchased at 1810 East Hazelton Avenue, Stockton, CA 95205.
BID
SCHEDULE:
-
Thornton Water Storage
Tank Project (Storage
Facility at 8600 West Mokelumne Avenue, Thornton, California)
Plans & Specifications ($35.00)
will be available on September 9, 2008, after 1:30 p.m.
Bid Opening - October 2, 2008, at County Public Works at 1:30 p.m.
Plan Holder's List

CURRENT BID
RESULTS:
Tracy Boulevard
Resurfacing
(Platti Road to Howard Road)
Bid Opening - August 28, 2008, at County Public Works at 1:30 p.m.
| CONTRACTOR |
BID AMOUND |
| Teichert Construction |
$1,350,242.50 |
| Top Grade Construction, Inc. |
$1,353,728.75 |
| Granite Construction Company |
$1,399,185.00 |
| DSS Company dba Knife River
Construction |
$1,412,625.00 |
| Tom Mayo Construction, Inc. |
$1,418,850.00 |
| George Reed, Inc. |
$1,447,641.50 |
Concrete Bridge Deck
Seal Program 2008
(El Dorado Street Bridge; McKinley Avenue Bridge; Tracy Boulevard Bridge;
Elliott Road Bridge; MacArthur Drive Bridge; Williamson Road Bridge)
Bid Opening - August 21 2008, at County Public Works at 1:30 p.m.
| CONTRACTOR |
BID AMOUNT |
| Bugler Construction |
NON-RESPONSIVE $179,939.00 |
| Debruin Construction, Inc. |
$180,592.00 |
| American Civil Constructors West
Coast, Inc. |
$190,507.00 |
| Hertel Construction Co. Inc. |
$292,563.00 |
Slurry Seal 2008
(RD2: Lincoln Village [east]; RD3: Country Club [north] and Pacific
Gardens; RD4: Morada [north] and Flag City; RD5: Raymus Village,
Bowling Green Estates, Spring Creek Estates, Koftinow Court and Patterson
Pass Business Park)
Bid Opening - August 14, 2008, at County Public Works at 1:30 p.m.
| CONTRACTOR |
BID AMOUNT |
| Valley Slurry Seal Company |
$968,905.47 |
| Graham Contractors, Inc. |
$982,601.42 |
| Intermountain Slurry Seal, Inc. |
$984,368.72 |
| California Pavement Management, Inc. |
$1,012,728.72 |
Byron Road Resurfacing
(Wicklund Road to Tracy City Limits [Lammers Road])
Bid Opening - August 7, 2008, at County Public Works at 1:30 p.m.
| CONTRACTOR |
BID AMOUNT |
| Tom Mayo Construction, Inc. |
$2,279,300.00 |
| Teichert Construction |
$2,372,547.50 |
| RGW Construction |
$2,464,372.50 |
| Granite Construction Company |
$2,464,985.00 |
| DSS Company dba Knife River
Construction |
$2,563,053.50 |
| Independent Construction Company |
$3,028,632.00 |
Thornton Water Storage
Tank Project (Storage Facility at 8600 West Mokelumne Avenue, Thornton)
Bid Opening - July 17, 2008, at County Public Works at 1:30 p.m.
| CONTRACTOR |
BID AMOUNT |
|
TTS Construction |
|
|
Base
Alternative "A"
Alternative "B" |
$1,136,586.00
80,000.00
100,000.00 |
RELIEF OF BID |
|
Conco West, Inc. |
|
|
Base
Alternative "A"
Alternative "B" |
$1,255,050.00
90,000.00
62,500.00 |
NON-RESPONSIVE |
|
Clayborn Contracting Group, Inc. |
|
|
Base
Alternative "A"
Alternative "B" |
$1,380,472.00
89,040.00
130,256.00 |
|
|
Diede Construction |
|
|
Base
Alternative "A"
Alternative "B" |
$1,415,686.39
88,972.00
67,850.00 |
|
|
Speiss Construction Co. |
|
|
Base
Alternative "A"
Alternative "B" |
$1,540,000.00
89,000.00
50,900.00 |
|
|
Pacific Mechanical Corp |
|
|
Base
Alternative "A"
Alternative "B" |
$1,611,000.00
84,000.00
65,000.00 |
|
Perimeter (LFG)
Migration Monitoring Wells (North County and Foothill Sanitary Landfills)
Bid Opening - July 17, 2008, at County Public Works at 1:30 p.m.
| CONTRACTOR |
BID AMOUNT |
|
NO BIDS RECEIVED |
McBride Avenue Bridge
Replacement, Federal Aid Project No. BRLO-5929(161) - across South San
Joaquin Irrigation District Canal
Bid Opening - July 10, 2008, at County Public Works at 1:30 p.m.
| CONTRACTOR |
BID AMOUNT |
| Granite Construction
Company |
$657,075.70 |
| Teichert Construction |
$899,696.40 |
| William P. Young
Construction |
$915,298.00 |
| McGuire and Hester |
$926,447.00 |
| Viking Construction
Company |
$1,015,457.00 |
| Agee Construction |
$1,093,332.00 |
| R. A. Nemetz Construction
Co., Inc. |
$1,362,359.00 |
| RGW Construction, Inc. |
$1,378,997.00 |
Banta Area Streets
Resurfacing (F Street, Sixth Street, Seventh Street, Stoneridge Drive &
Rocky Point Court)
Bid Opening - July 10, 2008, at County Public Works at 1:30 p.m.
| CONTRACTOR |
BID AMOUNT |
| Teichert Construction |
$416,530.00 |
| DSS Company dba Knife River
Construction |
$424,565.00 |
| Tom Mayo Construction, Inc. |
$427,550.00 |
| George Reed, Inc. |
$438,605.00 |
| Granite Construction Company |
$446,985.00 |
Tracy Boulevard Bridge
Electrical Repairs (Across Grant Line Canal)
Bid Opening - July 2, 2008, at County Public Works at 1:30 p.m.
| CONTRACTOR |
BID AMOUNT |
| Royal Electric Company |
$37,700.00 |
| Pacific Electric |
$49,500.00 |
| Industrial Electric Company |
$55,000.00 |
Baker Road Resurfacing
(Jack Tone Road to Cox Road)
Bid Opening - June 26, 2008, at County Public Works at 1:30 p.m.
| CONTRACTOR |
BID AMOUNT |
| George Reed, Inc. |
$1,043,765.00 |
| Granite Construction Company |
$1,044,885.00 |
| Tom Mayo Construction, Inc. |
$1,046,790.00 |
| Teichert Construction |
$1,102,695.00 |
| DSS Company |
$1,114,293.00 |
| Stevens Creek Quarry, Inc. |
$1,129,340.00 |
| Cruco Construction Group, Inc. |
$1,156,000.00 |
Compressed Natural Gas (CNG)
Fueling System Upgrade (121 South San Joaquin Street, Stockton)
Bid Opening - June 26, 2008, at County Public Works at 1:30 p.m.
| CONTRACTOR |
BID AMOUNT |
|
TNT Industrial Contractors, Inc. |
|
|
Base
Alternative "A"
Alternative "B" |
$252,174.00
$18,514.00
$109,787.00 |
Garden Acres - Walker
Lane Area Storm Drainage Improvements, Phase 2A and 2B (Ardelle Avenue:
Cardinal Avenue to Bird Avenue; Marsh Street: Walker Lane to east end;
Sonora Street: Walker Lane to east end)
Bid Opening: June 5, 2008 -
Bid Tab -
List of Subcontractors
| CONTRACTOR |
BID AMOUNT |
| Teichert Construction |
$610,421 |
| Preston Pipelines, Inc. |
$645,075 |
| DSS Company |
$789,608 |
Eleventh Street
Acceleration Lane (Bird Road intersection to +/- 500 feet east of Bird
Road)
Plans & Specifications ($10.00) will
be available on May 13, 2008, after 1:30 p.m.
Bid Opening: June 5, 2008 -
Bid Tab -
List of Subcontractors
| CONTRACTOR |
BID AMOUNT |
| Sierra Nevada Construction |
$139,007 |
| Granite Construction Company |
$141,985 |
| Tom Mayo Construction, Inc. |
$146,565 |
| Rodgers Construction & Engineering
Company, Inc. |
$146,760 |
| Teichert Construction |
$150,320 |
| DSS Company |
$160,375 |
| George Reed, Inc. |
$164,100 |
| Bellicitti & Pellicciotti
Construction Company, Inc. |
$195,650 |
Colonial Heights
Resurfacing, Phase 4 (Portola Avenue, San Luis Way, Santa Rosa Way, San
Gabriel Way, Arroyo Way, San Pablo Way)
Plans & Specifications ($10.00) will
be available on April 22, 2008, after 1:30 p.m.
Bid Opening - May 15, 2008, at County Public Works at 1:30 p.m.
| CONTRACTOR |
BID AMOUNT |
| Granite Construction Company |
$264,838.00 |
| DSS Company |
$266,505.00 |
| Teichert Construction |
$266.833.00 |
| George Reed, Inc. |
$294,740.00 |
Brandt Road and Morse
Colony Improvements (Brandt Road: SR 88 to Jack Tone Road; Golfview
Road: Eight Mile Road to Morse Road; Morse Road: Golfview Road to N
99 Frontage Road [W])
Bid Opening - April 17, 2008, at County Public Works at 1:30 p.m.
Bid Tab
List of Subcontractors
| CONTRACTOR |
BID AMOUNT |
| Teichert Construction |
$646,140.00 |
| Stevens Creek Quarry, Inc. |
$669,925.00 |
| Granite Construction Company |
$688,885.00 |
| DSS Company |
$690,540.00 |
| George Reed, Inc. |
$695,487.50 |
| Martin General Engineering, Inc. |
$732,212.00 |
| Independent Construction Co. |
$999,425.00 |
Gawne Road Resurfacing
(Mariposa Road to Van Allen Road)
Bid Opening - April 10, 2008, at County Public Works at 1:30 p.m.
Bid Tab
List of Subcontractors
| CONTRACTOR |
BID AMOUNT |
| DSS Company |
$683,310.00 |
| Granite Construction Company |
$685,535.00 |
| Teichert Construction |
$699,900.00 |
| George Reed, Inc. |
$714,300.00 |
| Stevens Creek Quarry, Inc. |
$772,000.00 |
| Martin General Engineering, Inc. |
$930,940.00 |
Sidewalk Accessibility
Improvements, Phase 5 (Various locations in Country Club, Woodbridge, and
Lincoln Village)
Bid Opening - March 20, 2008, at County Public Works at 1:30 p.m.
| CONTRACTOR |
BID AMOUNT |
| Teichert Construction |
$544,385.00 |
| Vanguard Construction |
$554,730.00 |
| J. J. R. Construction, Inc. |
$559,473.00 |
| DSS Company |
$653,660.00 |
| Stevens Creek Quarry, Inc. |
$656,399.00 |
| Odyssey Landscape Co., Inc. |
$694,093.16 |
| Sposeto Engineering, Inc. |
$718,006.00 |
| Martin General Engineering, Inc. |
$720,307.00 |
| Golden Bay Construction, Inc. |
$734,069.00 |
| BDS Construction, Inc. |
$801,295.00 |
| Granite Construction Company |
$846,985.00 |
| Cunningham & Sons, Inc. |
$963,980.00 |
| Lockwood General Engineering, Inc. |
$1,337,793.42 |
Lincoln Village Streets
Resurfacing (Greeley Way, Stanton Way, Cameron Way, Seward Way, McClellan
Way, Culpepper Place, Douglas Road, and Vicksburg Place)
Bid Opening - March 20, 2008, at County Public Works at 1:30 p.m.
| CONTRACTOR |
BID AMOUNT |
| Teichert Construction |
$406,348.00 |
| Tom Mayo Construction, Inc. |
$433,470.00 |
| Stevens Creek Quarry, Inc. |
$447,000.00 |
| DSS Company |
$458,486.00 |
| Granite Construction Company |
$464,885.00 |
| Martin General Engineering, Inc. |
$483,646.00 |
| George Reed, Inc. |
$588,657.00 |
Mackville Road
Resurfacing
(State Highway Route 12 & 88 to Jahant Road)
Bid Opening - February 14, 2008, at County Public Works at 1:30 p.m.
| CONTRACTOR |
BID AMOUNT |
| George Reed, Inc. |
$312,598.00 |
| Granite Construction Company |
$348,610.00 |
| Tom Mayo Construction, Inc. |
$356,080.00 |
Cherryland Avenue
Resurfacing
(State Highway Route 88 to Leonardini Road)
Bid Opening - February 7, 2008, at County Public Works at 1:30 p.m.
| CONTRACTOR |
BID AMOUNT |
| George Reed, Inc. |
$266,710.00 |
| Granite Construction Company |
$269,729.00 |
| Tom Mayo Construction, Inc. |
$271,075.00 |
| DSS Company |
$274,675.00 |
| Teichert Construction |
$280,510.00 |
| Cruco Construction Group, Inc. |
$282,785.00 |
Escalon-Bellota Road
Resurfacing
(State Highway Route 4 to Copperopolis Road)
Bid Opening - February 7, 2008, at County Public Works at 1:30 p.m.
| CONTRACTOR |
BID AMOUNT |
| George Reed, Inc. |
$537,733.00 |
| Teichert Construction |
$602,507.00 |
| Granite Construction Company |
$605,885.00 |
| Tom Mayo Construction, Inc. |
$624,140.00 |
| Cruco Construction Group, Inc. |
$695,833.50 |
Tokay Colony Road and
Forest Lake Road
Resurfacing
(State Highway Route 88 to Jack Tone Road; Lower Sacramento Road to North
99 Frontage Road West)
Bid Opening - February 7, 2008, at County Public Works at 1:30 p.m.
| CONTRACTOR |
BID AMOUNT |
| Granite Construction Company |
$533,575.00 |
| George Reed, Inc. |
$535,496.00 |
| Tom Mayo Construction, Inc. |
$543,550.00 |
| DSS Company |
$565,140.00 |
| Cruco Construction Group, Inc. |
$628,022.00 |
| Independent Construction Co. |
$639,433.50 |
Compressed Natural Gas (C.N.G.)
Fueling System Upgrade (121 S. San Joaquin Street, Stockton)
Bid Opening - January 10, 2008, at County Public Works at 1:30 p.m.
| CONTRACTOR |
BID AMOUNT |
| Performance Mechanical, Inc. |
$382,665.00 |
| ET Environmental California, GP |
$441,793.00 |
Hewitt Road and Campbell
Avenue Resurfacing (State
Highway Route 4 to Copperopolis Road; Lone Tree Road to Edwards Avenue)
Bid Opening - January 10, 2008, at County Public Works at 1:30 p.m.
| CONTRACTOR |
BID AMOUNT |
| George Reed, Inc. |
$672,505.00 |
| DSS Company |
$681,334.00 |
| Granite Construction Company |
$696,985.00 |
| Teichert Construction |
$721,800.00 |
| Tom Mayo Construction, Inc. |
$769,770.00 |
| Central Valley Engineering & Asphalt,
Inc. |
$774,780.30 |
| Independent Construction Company |
$791,089.14 |
| RGW Construction, Inc. |
$837,200.00 |
Archerdale Road
Resurfacing
(State Highway Route 26 to Baker Road)
Bid Opening - January 10, 2008, at County Public Works at 1:30 p.m.
| CONTRACTOR |
BID AMOUNT |
| George Reed, Inc. |
$193,872.00 |
| Teichert Construction |
$197,117.00 |
| Tom Mayo Construction, Inc. |
$204,905.00 |
| Granite Construction Company |
$208,256.00 |
| Central Valley Engineering & Asphalt,
Inc. |
$215,266.50 |
| DSS Company |
$217,848.75 |
| Independent Construction Company |
$247,526.18 |
| RGW Construction, Inc. |
$265,000.00 |
Duncan Road Resurfacing
(Copperopolis Road to State Highway Route 26)
Bid Opening - December 13, 2007, at County Public Works at 1:30 p.m.
| CONTRACTOR |
BID AMOUNT |
| George Reed, Inc. |
$732,180.00 |
| Granite Construction Company |
$772,985.00 |
| DSS Company |
$788,064.00 |
| Tom Mayo Construction, Inc. |
$857,444.00 |
| Independent Construction Co. |
$897,851.00 |
| Fagundes & Son, Inc. |
$926,483.00 |
| Desilva Gates Construction L.P. |
$934,715.00 |
Austin Road Improvements
(Louise Avenue to French Camp Road)
Bid Opening - December 13, 2007, at County Public Works at 1:30 p.m.
| CONTRACTOR |
BID AMOUNT |
| George Reed, Inc. |
$758,704.50 |
| Teichert Construction |
$788,858.00 |
| DSS Company |
$795,200.00 |
| Sierra Nevada Construction, Inc. |
$807,007.00 |
| Granite Construction Company |
$813,020.00 |
| Tom Mayo Construction Company, Inc. |
$903,830.00 |
| Fagundes & Son, Inc. |
$904,079.00 |
| Independent Construction Company |
$913,535.00 |
| Desilva Gates Construction L.P. |
$995,870.00 |
Airport Way Bridge
Seismic Retrofit (across San Joaquin River)
Bid Opening - December 6, 2007, at County Public Works at 1:30 p.m.
| CONTRACTOR |
BID AMOUNT |
| Dutra Construction Co., Inc. |
$2,248,637.80 |
| Golden State Bridge, Inc. |
$2,364,371.50 |
| William P. Young Construction, Inc. |
$2,851,292.00 |
| Vortex Marine Construction, Inc. |
$2,888,511.00 |
| Shimmick Construction Co., Inc. |
$2,955,800.00 |
| MCM Construction, Inc. |
$3,131,146.12 |
| Power Engineering Contractors, Inc. |
$3,719,149.75 |
| American Civil Constructors West Coast,
Inc. |
$3,969,784.60 |
Beyer Lane Resurfacing (State
Route 26 to State Route 88)
Bid Opening - November 15, 2007, at County Public Works at 1:30 p.m.
| CONTRACTOR |
BID AMOUNT |
| George Reed, Inc. |
$322,015.00 |
| Tom Mayo Construction, Inc. |
$333,760.00 |
| Teichert
Construction |
$341,340.00 |
| DSS Company |
$349,800.00 |
| Granite
Construction Company |
$350,025.00 |
| Central
Valley Engineering & Asphalt, Inc. |
$361,064.00 |
| O'Grady
Paving, Inc. |
$468,640.00 |
Schulte Road Resurfacing (Hansen
Road to Lammers Road)
Bid Opening - November 15, 2007, at County Public Works at 1:30 p.m.
| CONTRACTOR |
BID AMOUNT |
| Teichert Construction |
666.930.00 |
| Granite Construction Company |
681.885.00 |
| Tom Mayo Construction, Inc. |
688,650.00 |
| DSS Company |
726,553.00 |
| George Reed, Inc. |
751,266.00 |
| Central Valley Engineering &
Asphalt, Inc. |
783,715.00 |
| O'Grady Paving, Inc. |
942,832.00 |
Carpenter Road and Three
Oaks Road Resurfacing
(Mariposa Road to east end; Carpenter Road to south end)
Bid Opening - November 8, 2007, at County Public Works at 1:30 p.m.
| CONTRACTOR |
BID AMOUNT |
| George Reed, Inc. |
$315,384.50 |
| Tom Mayo Construction, Inc. |
$345,590.00 |
| Granite Construction Company |
$348,885.00 |
| DSS Company |
$350,980.00 |
| Central Valley Engineering & Asphalt,
Inc. |
$381,019.75 |
Jack Tone Road
Resurfacing (French Camp Road to Wildwood Road)
Bid Opening - November 1, 2007, at County Public Works at 1:30 p.m.
|
CONTRACTOR |
BID AMOUNT |
| Central Valley Engineering & Asphalt,
Inc. |
$411,092 |
| DSS Company |
$729,995 |
| Granite Construction Company |
$731,885 |
| Teichert Construction |
$742,540 |
| Tom Mayo Construction, Inc. |
$801,818 |
| George Reed, Inc. |
$812,426 |
| Top Grade Construction, Inc. |
$874,792 |
Bus Stop Improvements,
Phase I (various locations)
Bid Opening - November 1, 2007, at County Public Works at 1:30 p.m.
| CONTRACTOR |
BID AMOUNT |
| D.S.S. Company |
$168,251 |
| Tom Mayo Construction, Inc. |
$169,190 |
| Vanguard Construction |
$192,200 |
| Sposeto Engineering, Inc. |
$204,668 |
| Rodgers Construction & Engineering Co.,
Inc. |
$216,000 |
| Granite Construction Company |
$218,840 |
| J.A. Gonsalves & Son Construction, Inc. |
$254,610 |
| A.M. Stephens Construction Co., Inc. |
$262,120 |
| Central Valley Engineering & Asphalt,
Inc. |
$293,620 |
North County Recycling
Center and Lovelace Transfer Station Tipping Floor Repair Project
Bid Opening - August 16, 2007, at County Public Works at 1:30 p.m.
| CONTRACTOR |
BID AMOUNT |
| Structural Group, Inc. |
$1,059,056.00 |
Slurry Seal 2007
(Various Locations in Stockton, Morada, Lodi, and Linden)
Bid Opening - July 26, 2007, at County Public Works at 1:30 p.m.
| CONTRACTOR |
BID AMOUNT |
| California Pavement Maintenance Co. |
$799,048.50 |
| Valley Slurry Seal Company |
$888,702.85 |
| Intermountain Slurry Seal, Inc. |
$904,481.00 |
Linne Road & Mac Arthur
Drive Improvements
(Linne Road: Tracy Boulevard to Mac Arthur Drive; Mac Arthur Drive:
Linne Road to 1,800 feet south)
Bid Opening - July 19, 2007, at County Public Works at 1:30 p.m.
| CONTRACTOR |
BID AMOUNT |
| Granite Construction Company |
$944,985.00 |
| Teichert Construction |
$1,111,180.00 |
| GRW Construction, Inc. |
$1,517,330.00 |
** Disclaimer:
Bid information is provided as an informational service only. Bid
dates and times are subject to change and may not be reflected on this web
page. The San Joaquin County Board of Supervisors reserves the right
to reject any or all bids. The award of a contract, if it is
awarded, will be to the lowest responsible bidder whose proposal complies
with all the prescribed project Plans and Specifications.

|