Public Health
Laboratory Replacement
Replacement facility that
will meet regulatory requirements for laboratory performance and safety.
The project proposes a new laboratory of approximately 10,000 square
feet; and includes built-in lab casework, fumehoods, and biological
safety cabinets.

Jail Kitchen
Replacement
Replace the Jail kitchen with
a new kitchen under the present operating parameters with the capability
to provide for a cook-chill production method and sized to serve 2,500
inmates. Advance planning activities propose a Jail Kitchen food service
facility of approximately
31,000 square feet consisting of cook-chill food preparation facilities,
multiple refrigeration and food storage areas, loading and unloading
areas, etc., as well as the required features and appurtenances
associated with a detention facility.

Fleet Services
Complex
Construction of a new
facility for Fleet Services operations.

Jail Expansion
The project proposes to
construct two 512-bed pretrial units. A current Jail Needs Assessment
Study is underway to determine the specific needs related to any
proposed project through the review of inmate population forecasts and
supporting requirements associated with an expanded Jail. Modification
of the project scope might be needed following finalization of the
ongoing Needs Assessment Study.

Disclaimer:
This project information is provided as an informational service only.
Each individual County project has project specific requirements.
Individual project requirements are outlined in the specific project
documents. Dates and times are subject to change. These changes may not be
noted on this web page.